Tola - logs beeing prepared for export by taking away the outside rim 

Transport of a band resaw delivered to a customer in Tanzania . The forklift is slightly overdimensionned isn't it ? 

PRIMULTINI @ LIMHOUT. 

Some very brave Congolese workers seem to have troubles with a log lying in their way . 

FULLPOWER band resaw FTF-900  N and SWEED CE 300 + father & our youngest daughter

DECOLVENAERE - GENT 

The new reasw is almost ready for ite 1st cuts 

moving in Kinshasa is not always very easy 

Inside a sawmill we are shipping out to Canada, collecting the sawdust is done the good old American style 

dismantling a sawmill in Germany is not necessarily an easy job 

Description

From concept until construction and start up. This whole project is without any doubt the biggest project ever for SEYNA. we have supplied from the buildings and the overheadcrane , over the forklifts until the machinery for cutting the hardest and longest woods in Gabon. Engineers from PRIMULTINI & PRIBO have started the set up on November 22nd and its intented to start cutting before christmas 2013.


 
SEYNA nv
Wagenaarstraat 43
8791 Waregem/Beveren-leie
Tel: +32 56 77 75 17
info@seyna.com
© 2012 | Webdesign by My-Websitebuilder.com  |  SEO & SEA by Opti-Seo.com | mobile